At Andoulakis Prefabricated Houses, we have created three different delivery-construction stages for clients who prefer not to receive their home at a completed stage. You have the option to receive your home at semi-finished Stage A or B and continue the completion process yourself, or we can deliver it to you turnkey!

You can choose the delivery stage based on the tasks you want to complete on your own, adjusting your costs and expanding material options.

Stage A

Complete exterior of the residence

·     

– Urban planning study based on the cadastral survey

– Architectural Design

– 3D design of the house and the surrounding area

– Issuance of Building Permit

– Project supervision at all stages (earthworks, foundation, basement construction, surroundings, project delivery)

– Wall construction with an external thermal insulation system, Andoulakis Technology, and internal visible frame.

– Ventilated roof, Non-walkable Roof or Walkable Roof with multiple layers, sound-thermal-moisture insulation, Andoulakis Technology

– Mezzanine (in multi-story buildings) with multiple layers, sound-moisture insulation, Andoulakis Technology

– Internal or external staircase (where applicable)

– Covered external spaces, balconies, pergolas, if applicable, without tile coverings

*Not included in Stage A, available upon request:*

– External windows, EUROPA aluminum thermally-insulated or PVC REHAU, white color, with double energy-efficient glass for all seasons, screens in all areas, and aluminum rolling shutters in the bedrooms.

Stage B

Construction of the house with electro-hydraulic installations

·   

– Urban planning study based on the cadastral survey

– Architectural Design

– 3D design of the house and the surrounding area

– Issuance of Building Permit

– Project supervision at all stages (earthworks, foundation, basement construction, surroundings, project delivery)

– Wall construction with an external thermal insulation system, Andoulakis Technology, and internal visible frame.

– Ventilated roof, Non-walkable Roof or Walkable Roof with multiple layers, sound-thermal-moisture insulation, Andoulakis Technology

– Mezzanine (in multi-story buildings) with multiple layers, sound-moisture insulation, Andoulakis Technology

– Internal or external staircase (where applicable)

– Covered external spaces, balconies, pergolas, if applicable, without tile coverings

– Electrical Installations

– Hydraulic Installations

– Cooling-heating installations, if applicable

– Sewage Installations

– Sound-thermal insulation investments with natural mineral wool between the framework

– Internal OSB cladding for moisture protection

– KNAUF gypsum board claddings

– Cement mortars inside and outside the house

*Not included in Stage B, available upon request:*

– External windows, EUROPA aluminum thermally-insulated or PVC REHAU, white color, with double energy-efficient glass for all seasons, screens in all areas, and aluminum rolling shutters in the bedrooms.

Stage C

Fully equipped residence – “Turnkey”

·     

– Urban planning study based on the cadastral survey

– Architectural Design

– 3D design of the house and the surrounding area

– Issuance of Building Permit

– Project supervision at all stages (earthworks, foundation, basement construction, surroundings, project delivery)

– Wall construction with an external thermal insulation system, Andoulakis Technology, and internal visible frame.

– Ventilated roof, Non-walkable Roof or Walkable Roof with multiple layers, sound-thermal-moisture insulation, Andoulakis Technology

– Mezzanine (in multi-story buildings) with multiple layers, sound-moisture insulation, Andoulakis Technology

– Internal or external staircase (where applicable)

– Covered external spaces, balconies, pergolas, if applicable, without tile coverings

– Electrical Installations

– Hydraulic Installations

– Cooling-heating installations, if applicable

– Sewage Installations

– Sound-thermal insulation investments with natural mineral wool between the framework

– Internal OSB cladding for moisture protection

– KNAUF gypsum board claddings

– Cement mortars inside and outside the house

– External windows, EUROPA aluminum thermally-insulated or PVC REHAU, white color, with double energy-efficient glass for all seasons, screens in all areas, and aluminum rolling shutters in the bedrooms

– Floor coverings – Laminate

– Wall-floor tile claddings in bathrooms-WC-kitchen

– Internal doors

– Carpentry works: Kitchen, Wardrobes, etc.

– Sanitary ware, faucets, sink

– Interior color coatings of the house

– Delivery of the residence by Andoulakis